Use this tool to answer the following questions regarding the sample data. Email your solutions to the Teaching Assistant.
Assume the average labor costs are 2 minutes to pick from reserve, 1 minute from forward, and that 3 minutes to restock.
What is the minimum total labor required to move the given product through a forward
piece-pick area consisting of 40 bays of flow rack (which is described in the accompanying
file flowrack.properties
)?
What are the last ten bays of flow rack worth in this environment?